Winter completed a phased, occupied renovation of all the common areas of the Downtown Nashville hotel, which required unprecedented and innovative installation methods.

Winter refreshed the main lobby, bar, main entrance and back entrance, main ballrooms, all prefunction areas, meeting and conference rooms, public restrooms, pool/fitness area, and back offices. Additionally, Winter rebuilt the restaurant, club lounge, and sundries; made garage entrance and terrace level improvements; improved lighting/dimming throughout; and installed 13 chandeliers in the 26-story atrium that required an exterior crane and custom scaffold/lift.

The hotel remained operational throughout the renovations with the exception of a two-week demolition period.