Winter expanded and renovated the existing Sutton Middle School located in the Chastain Park area of Atlanta. Due to unidentified hazardous materials and unforeseen and unacceptable existing building envelope conditions, Winter significantly adjusted the construction scope. Winter restored the exterior and renovated the interior of the entire complex, as well as constructed an addition. Winter removed the asbestos and hazardous material from the building, performed exterior renovations, and gutted the building’s interior to construct the reconfigured space. Winter also constructed a 10,000 square-foot addition that contains classrooms and a media center. A small amphitheater was added to the wooded landscape.